ATgames (Atari Games)

El Segundo, CA

Project Description

ATgames consisted of 20,000 SF of first generation tenant improvements built out from a cold shell with design/build MEP’s. The project included a new 3rd floor structural mezzanine totaling 5,000 SF, as well as (3) sets of structural steel stairs. RAM completed the TI within 14 weeks, a schedule that included a phased project delivery to construct the first and second floor while the structural steel mezzanine and stairs were fabricated and installed. Once the first two floors were completed by week 10, it allowed for four weeks to build out the 3rd floor and install the steel stairs.

Project Features

The high-end finishes, exposed brushed structural steel, and open atrium from the top floor to the entry lobby creates a welcoming and exciting entry focal point. Amongst the entry, other high-end features include open ceilings, high-polish concrete, operable partitions, and break rooms with roll-up doors to the exterior patio.

About Us

1300 Quail Street
Suite 206
Newport Beach, CA 92660

949.412.6500

License number: #1038156