ATgames (Atari Games)

El Segundo, CA

Project Description

ATgames TI consisted of 20,000 SF of first-gen tenant improvements built out from cold shell with design/build MEP’s. The project included a new third-floor structural mezzanine totaling 5,000 SF as well as (3) sets of structural steel stairs. RAM completed the TI within 14 weeks which included a phased project delivery to build out floors 1 & 2 while the structural steel mezzanine and stairs were fabricated & installed. Once the first two floors were complete by week 10 that allowed for 4 weeks to build out the 3rd floor and install the steel stairs. The high-end finishes, exposed brushed structural steel and open atrium from the top floor to the entry lobby create a welcoming and exciting entry focal point. Amongst the entry, there are other high-end features including open ceilings, high polish concrete, operable partitions, and breakrooms with roll-up doors to the exterior patio. RAM Constructions competitive pricing, design/build savings, and tactful value engineering brought this project back to life after being sidelined for two years. The total value engineering, design/build savings, and competitive bids offered over $650k reduction in total construction costs in comparison to the 5 bids provided by competitors, allowing the development company to meet their proforma and the tenant to receive a creative office space of their dreams.

Latest Projects

Mother's Organic Kitchen

Project Title

Project Title